| Rating Criteria |
Explanation Rank |
| Level - 3 |
If a fault occurs, git is likely that there is a defect in the main structural bearing parth. |
| Level - 2 |
If a fault occurs, gThere is certain probability of a defect in the main structural bearing parth. |
| Level - 1 |
If a fault occurs, gThere is low probability of a defect in the main structural bearing parth. |
| Usage |
Measurement part |
Measurement distance |
Rank display |
Inclination |
 |
Floor |
Between two points of about 3m |
Level - 3 |
Inclination of over 6/1,000 |
| Level - 2 |
Inclination of over 3/1,000 but less than 6/1,000 |
| Level - 1 |
Inclination of less than 3/1000 |
| WallEPillar |
Between two points of about 2m |
Level - 3 |
Inclination of over 6/1,000 |
| Level - 2 |
Inclination of over 3/1,000 but less than 6/1,000 |
| Level - 1 |
Inclination of less than 3/1000 |
 |
Floor |
Between two points of about 3m |
Level - 3 |
Inclination of over 3/1,000 |
| Level - 2 |
Inclination of over 1.5/1,000 but less than 3/1,000 |
| Level - 1 |
Inclination of less than 1.5/1000 |
| WallEPillar |
Between two points of about 2m |
Level - 3 |
Inclination of over 6/1,000 |
| Level - 2 |
Inclination of over 1.5/1,000 but less than 3/1,000 |
| Level - 1 |
Inclination of less than 1.5/1000 |
¦The inclination for construction is a display of 1/2 for the inspection.